New Construction Buyer's Guide — July 2026

Arizona New Construction
Phase Inspection Guide 2026

Pre-Pour Foundation. Pre-Drywall Framing. Final Walk. Three inspections that protect your $600,000+ purchase — and why skipping them is the most expensive mistake a new construction buyer can make in Phoenix.

By Ryan Moxley, REALTOR® Updated: July 23, 2026 My Home Group • Phoenix Metro 30+ min read
3
Critical Phase Inspections
10yr
ARS §12-1361 Structural Warranty
$80K
Avg Cost if Foundation Defect Missed
$400
Cost of Pre-Pour Inspection

The Myth of New Construction Risk-Free Status

The assumption is understandable: if something is brand new, it must be free of defects. New car. New appliance. New home. The logic tracks for manufactured products with quality control at every production step. It breaks down completely for custom-built structures where dozens of subcontractors work on your specific property over 9–14 months, often under weather pressure, scheduling pressure, and the very human tendency toward shortcuts when nobody is watching.

The data on new construction defects is sobering. ASHI (American Society of Home Inspectors) research consistently shows that new construction homes have defects at rates comparable to resale homes — the defects are just different in character. Resale home defects surface over time through use: a roof that was installed marginally and develops leaks after three monsoon seasons, a plumbing connection that held for five years before failing. New construction defects are structural and systemic: framing that violates the load path design, post-tension cables placed too close to the slab edge, return air ducts sized for a smaller home than you purchased, stucco flashing omitted at a window penetration that will admit monsoon water for decades.

The critical difference is when these defects can be addressed. In resale, defects are discovered after they manifest — meaning after damage has occurred, after mold has had time to grow, after water has saturated framing for years. In new construction, defects are created DURING construction and then buried behind concrete, drywall, stucco, and flooring before you close. The only window to discover and require remediation is DURING construction — which is exactly what phase inspections provide.

Why Builder Quality Control Isn't Enough

Builder quality control departments inspect their own work. Their superintendents have close count targets. Their QC inspectors report to managers whose performance is measured by completions, not defect rates. Independent inspectors work for YOU — and only for you. They have no incentive to pass substandard work. The builder's inspector and your inspector are not interchangeable.

Arizona's New Construction Inspection Landscape

No State Licensing for Home Inspectors

Arizona is one of the states that does not require licensing for home inspectors. This means anyone can hold themselves out as a home inspector in Arizona. For new construction phase inspections, this makes credential verification especially important. Look exclusively for inspectors with:

The Arizona Construction Timeline

Understanding when your phase inspections need to happen requires understanding the construction sequence. In Arizona's Phoenix metro market, the typical production builder timeline for a single-family residence:

  1. Lot preparation and grading (1–2 weeks)
  2. Underground plumbing and electrical rough-in, utility stubs (1–2 weeks)
  3. Concrete forms, rebar, post-tension cable placement → PRE-POUR INSPECTION WINDOW
  4. Foundation pour and cure (3–4 weeks curing before framing)
  5. Framing — walls, floor structure (if 2-story), roof trusses (3–6 weeks)
  6. Exterior sheathing, roofing, window/door installation
  7. Electrical rough-in, plumbing rough-in, HVAC rough-in → PRE-DRYWALL INSPECTION WINDOW
  8. Insulation installation
  9. Drywall hang, tape, texture, paint
  10. Finish trades: flooring, cabinets, countertops, fixtures, hardware
  11. HVAC and plumbing trim-out (connect fixtures to rough-in)
  12. Exterior: stucco, paint, landscaping grading, concrete flatwork
  13. Certificate of Occupancy inspection by local building department
  14. Builder Blue Tape walkthrough (cosmetic items)
  15. Independent final inspection → FINAL INSPECTION WINDOW
  16. Closing

The inspection windows are narrow. Pre-pour: typically 24–48 hours between cable/rebar placement and concrete pour. Pre-drywall: typically 1–2 weeks between rough-in completion and insulation/drywall. Final: 3–7 days before close. Monitor your build progress proactively — ask your builder's superintendent for weekly status updates and schedule inspectors in advance so they're available on short notice.

Phase 1

Pre-Pour Foundation Inspection — The Most Time-Critical Window

When: After lot grading, underground utilities, concrete forms, rebar, and post-tension cables are placed — BEFORE concrete is poured. This window is often only 24–48 hours. You must have an inspector lined up in advance.
Cost: $250–$450 (one of the shortest inspections; the inspector evaluates a flat lot)
Duration: 1–2 hours on site

What the Inspector Checks

Why Post-Tension Slab Pre-Pour Inspection Is Critical in Arizona

Post-tension (PT) slabs are the universal standard for production housing in the Phoenix metro — essentially every home built after approximately 1985 uses this system. Here is why this inspection is non-negotiable:

Once concrete is poured, the exact location of every PT cable is unknowable from the surface. The contractor may have as-built drawings showing planned cable locations, but field placement often varies from drawings. If you ever need to cut into your slab — for plumbing modifications, adding a drain, or structural work — the risk of cutting a PT cable is severe. Severing a post-tensioned cable releases the stored tension catastrophically. This is both a safety hazard and a structural event that can crack or compromise the slab.

Additionally, if PT cables are incorrectly placed during construction (wrong spacing, too close to slab edge, inadequate concrete cover), the structural integrity of your foundation is compromised from Day 1 in a way that may not manifest as visible cracking for years — but that is a latent defect that WILL surface eventually.

Under ARS §12-1361, the builder is liable for structural defects for 10 years. But to enforce that right, you need documentation that the defect existed as a construction error — not damage that occurred post-close. A pre-pour inspection report with photographs is the evidentiary record that makes this claim enforceable.

Phase 2

Pre-Drywall / Framing Inspection — The Most Information-Rich Inspection

When: After framing is complete, electrical rough-in, plumbing rough-in, and HVAC rough-in are complete — BEFORE insulation is installed and drywall is hung. This window is typically 1–2 weeks.
Cost: $350–$600
Duration: 2–4 hours on site (most comprehensive of the three inspections)

This is the inspection that experienced new construction buyers describe as "opening the walls" — because it literally is. Every system that will be permanently concealed behind drywall is visible: every wire, every pipe, every duct, every connection. An experienced inspector can identify a week's worth of subcontractor mistakes in a single walk-through. This inspection catches the highest value and highest frequency of defects.

Framing Inspection Points

Electrical Rough-In Inspection Points

Plumbing Rough-In Inspection Points

HVAC Rough-In Inspection Points — Critical in Arizona

HVAC is the single most important system in an Arizona home. Phoenix experiences 100+ days above 100°F annually. A correctly designed and installed HVAC system is the difference between a comfortable, energy-efficient home and an inadequate system that runs 24 hours a day, barely keeps up, and fails prematurely. The pre-drywall inspection catches HVAC issues before they're buried and before the system operates — issues found now cost almost nothing to fix; issues found after drywall and completion can cost thousands to diagnose and tens of thousands to remediate.

Stucco Penetration Inspection — AZ-Specific Critical Item

This item deserves its own emphasis because stucco water intrusion at penetrations is the most common defect discovered in Arizona new construction phase inspections — and because it is completely invisible after stucco is applied.

Every place a pipe, wire, conduit, or other element penetrates through the stucco exterior is a potential water intrusion point. Monsoon rain in Phoenix, while limited in total annual inches, is intense — 1–2 inches in a single hour at high intensity. Improperly flashed penetrations allow this water to enter the wall cavity, where it saturates framing, insulation, and eventually drywall. In a dry climate, this moisture doesn't visibly manifest for months or years — but the damage (mold, wood rot, structural deterioration) is ongoing.

The pre-drywall inspection examines all penetrations in the exterior sheathing — particularly at window flanges, door thresholds, electrical boxes, plumbing penetrations, HVAC line sets, and trim details. Proper waterproof flashing tape, weather-resistant barrier overlap, and caulking specifications should be verified at every penetration before stucco is applied over them.

Phase 3

Final Pre-Close Inspection — Complete Systems Verification

When: Home is 100% complete; builder has conducted their own Blue Tape walkthrough — but BEFORE your closing. Schedule 3–7 days before your close date.
Cost: $400–$700 (most thorough inspection; all systems are now operable)
Duration: 3–5 hours on site

The final pre-close inspection is not the same as the builder's "Blue Tape" walkthrough. The builder's Blue Tape exercise identifies cosmetic deficiencies: paint touch-ups, grout inconsistencies, scratched flooring, damaged trim. These are legitimate items that the builder should repair before closing. But they are entirely cosmetic — the Blue Tape process does not evaluate system performance, structural integrity, or the quality of rough-in work now hidden behind finishes.

Your independent final inspection operates all systems, verifies installation quality, and looks for evidence of problems that may be concealed beneath finished surfaces. An experienced inspector who has done pre-drywall on the same home (ideal, but not always possible) knows what was behind the walls and can assess whether the rough work translated correctly into the finished systems.

HVAC System Verification

Plumbing Verification

Electrical Verification

Windows, Doors, and Weatherstripping

Flooring Assessment

Exterior Assessment

Top 10 Defects Found in Arizona New Construction Phase Inspections

# Defect Phase That Catches It Frequency Repair Cost If Missed
1 Stucco penetration flashing missing or improper Pre-Drywall Very High $2,000–$20,000 (stucco tear-off and remediation)
2 HVAC return air duct undersized Pre-Drywall High $3,000–$12,000 (major duct modification post-drywall)
3 PT cable placement deviation from plan Pre-Pour Moderate $15,000–$80,000 (slab repair or engineering remediation)
4 Drain pipe slope insufficient Pre-Drywall Moderate $4,000–$18,000 (slab cutting, re-plumbing)
5 Missing fire blocking at penetrations Pre-Drywall Moderate $500–$3,000 (access cutting if drywall is installed)
6 GFCI protection missing in required zones Pre-Drywall / Final Moderate $200–$800 per outlet (relatively inexpensive but a code violation)
7 Hollow tile (adhesion failure) Final Moderate $500–$5,000 depending on extent (re-tiling)
8 Condensate drain slope issues or missing secondary pan Pre-Drywall / Final High $500–$3,000 (remediation plus any water damage)
9 Framing: missing hurricane ties at truss-to-wall connection Pre-Drywall Moderate $2,000–$8,000 (ceiling opening required post-drywall)
10 Lot drainage directing water toward foundation Final Moderate $1,500–$6,000 (regrading, drainage installation)

Cost-Benefit Analysis: Phase Inspection vs. Post-Close Defect Repair

Inspection Inspection Cost Top Defect It Catches Post-Close Repair Cost ROI Multiple
Phase 1: Pre-Pour $250–$450 PT cable misplacement $15,000–$80,000 33–178x
Phase 2: Pre-Drywall $350–$600 Stucco flashing missing $2,000–$20,000 5–57x
Phase 2: Pre-Drywall $350–$600 HVAC return air undersized $3,000–$12,000 8–34x
Phase 3: Final $400–$700 Drainage toward foundation $1,500–$6,000 4–15x
All 3 Inspections Combined $1,000–$1,750 All categories Up to $100,000+ 57–100x+

Phase Inspection Timeline vs. Build Schedule

Build Phase Approx. Timing Inspection? Action Required
Lot prep & grading Months 1–2 No Confirm lot drainage plan with builder
Underground utilities, rebar, PT cables placed Month 2 PRE-POUR — Schedule immediately 24–48 hour window before concrete pour
Concrete slab pour and cure Months 2–3 No Wait for cure (3–4 weeks before framing)
Framing — walls, trusses, sheathing Months 3–5 No (visible; flag obvious issues) Photograph progress; note concerns for pre-drywall
Rough-in: electrical, plumbing, HVAC complete Months 5–6 PRE-DRYWALL — Schedule within 1–2 weeks 1–2 week window before insulation/drywall
Insulation, drywall, texture, paint Months 6–8 No Rough-ins now concealed
Finish trades: flooring, cabinets, counters, fixtures Months 8–10 No Optional visit to observe finish quality
HVAC trim-out, exterior completion, CO inspection Months 10–12 No Begin scheduling final inspector
Builder Blue Tape walkthrough 30–45 days before close No (attend; document cosmetic items) Attend builder walkthrough; submit cosmetic list
Pre-close: 3–7 days before close 3–7 days before close FINAL INSPECTION Independent full-systems inspection
Closing Month 12–14 No Verify all items resolved; close with confidence

How to Work With Your Builder During Inspections

Your Right to Inspect

In Arizona, new construction buyers have the right to conduct inspections during the construction process. Most builder purchase agreements include language acknowledging this right, though they may require advance notice (typically 24–48 hours) and that the inspector be accompanied by a builder representative or schedule through the superintendent. Communicate early with your builder's superintendent about your intent to conduct phase inspections — frame it as standard practice for a purchase of this size, not as a challenge to their quality. Most construction professionals understand and respect buyers who take this seriously.

What to Do With Findings

When your inspector identifies a defect or concern, the process is:

  1. Receive the written inspection report. Most inspectors provide a written report with photographs within 24–48 hours of the inspection.
  2. Prioritize findings. Your agent helps categorize: (A) structural or code violations requiring builder correction, (B) quality concerns that are negotiable, (C) personal preference items that are buyer responsibility.
  3. Submit in writing to the builder. Send a written notice (email with read receipt) to your builder's sales representative and superintendent listing the items you require remediation on, referencing your inspector's report and photographs.
  4. Builder response. For legitimate defects, Shea and other quality builders will correct — this is both their contractual obligation and their ARS §12-1361 statutory obligation. Code violations MUST be corrected.
  5. Verify repairs before close. Ask your inspector to verify key repairs are complete before your closing date.

ARS §12-1361: Arizona's Right to Repair Law

Arizona's Right to Repair statute establishes both your warranty rights as a new construction buyer and the process for enforcing them. Key provisions:

Frequently Asked Questions — New Construction Inspections in Arizona

Do new construction homes in Arizona need an inspection?
Yes — absolutely. New construction homes have defects at rates comparable to resale homes; the defects are simply different in character and are buried behind finishes before you ever see them. The only window to catch construction defects is DURING construction via phase inspections. Arizona has no state licensing for home inspectors, so verify ASHI or InterNACHI credentials when selecting an inspector.
What is a pre-pour foundation inspection in Arizona?
A pre-pour foundation inspection is conducted after the concrete forms, rebar, and post-tension cables are placed but BEFORE the concrete is poured. In Phoenix, virtually all production homes use post-tension (PT) slabs. Once poured, PT cable locations are unknowable. The pre-pour inspection verifies cable spacing, coverage depth, rebar placement, vapor barrier, and utility stub locations — creating an evidentiary record for ARS §12-1361 structural warranty claims. Cost: $250–$450. This 24–48 hour window must be planned in advance.
What does a pre-drywall inspection cover in Arizona new construction?
A pre-drywall inspection examines all systems that will be permanently concealed: framing (stud spacing, headers, hurricane ties), electrical rough-in (wire routing, box placement, GFCI zones), plumbing rough-in (drain slope, P-trap locations, cleanout access), HVAC rough-in (return air sizing, duct routing, condensate drain), and stucco penetration flashing. This is the most information-rich of the three inspections. Cost: $350–$600, conducted during the 1–2 week window before insulation and drywall installation.
How long does a builder have to fix warranty issues in Arizona?
Under ARS §12-1361, Arizona builders must be given the opportunity to repair before litigation. Warranty periods: 1 year (workmanship), 8 years (mechanical), 10 years (structural). You must provide written notice of the defect; the builder has 60 days to respond and offer to repair. If they refuse or don't respond, you may pursue legal remedies. Documenting defects with inspector reports and photographs during construction creates the evidentiary record that makes these claims enforceable.

Buying New Construction in Arizona?

Ryan Moxley coordinates phase inspections for every new construction buyer he represents. You get expert guidance from contract through close — at no cost to you. The builder pays Ryan's commission.

Call (480) 227-9143 Schedule a Free Consultation

Questions About Your New Construction Inspection?

Tell Ryan where you are in the process — he can recommend inspectors and advise on next steps.

Ryan Moxley • My Home Group • (480) 227-9143 • moxleysellsaz@gmail.com

Choosing Your Phase Inspector: What to Ask Before Hiring

With no state licensing requirement for home inspectors in Arizona, the responsibility falls entirely on you to vet inspectors before hiring. For new construction phase inspections specifically, you need someone who understands construction sequences, building codes adopted in your jurisdiction, and the AZ-specific items (PT slabs, stucco, HVAC sizing for desert climates) that matter in Phoenix metro construction.

Questions to Ask Every Prospective Inspector

  1. "How many new construction phase inspections have you conducted in the last 12 months?" You want an inspector who does this regularly — not someone who primarily inspects resale homes and occasionally gets a phase inspection request. Look for 25+ phase inspections per year as a baseline of meaningful experience.
  2. "Are you an ASHI member, InterNACHI member, or both?" These professional credentials require examination, documented experience, and continuing education. An inspector without either credential is not necessarily unqualified, but you have less third-party verification of their competence.
  3. "Do you have a thermal imaging camera and do you use it at every phase?" Thermal cameras identify issues invisible to the naked eye: air gaps in insulation, HVAC duct leaks, moisture in wall cavities, and electrical hot spots. For a pre-drywall inspection, thermal imaging catches issues that a visual-only inspection would miss.
  4. "Have you inspected homes built by [your specific builder] before?" Familiarity with a builder's construction practices, their typical subcontractors, and their common quality control gaps is genuinely useful. An inspector who has done 50 pre-drywall inspections on Shea homes knows exactly where to focus attention.
  5. "How quickly can you be available for a pre-pour inspection if I give you 24 hours' notice?" The pre-pour window may give you only 24 hours. You need an inspector who can respond quickly. Establish this relationship before you need it.
  6. "What does your written report include?" A quality inspection report includes: itemized findings with severity rating (safety concern, code violation, quality defect, observation/monitoring), photographs for every finding, and recommendations. Ask to see a sample report.
  7. "Do you attend the builder's walkthrough with the buyer if requested?" Some inspectors offer this service — accompanying you to the builder's pre-close walkthrough to advise in real-time. This can be valuable.

What to Expect to Pay for Phase Inspections in Phoenix 2026

Inspection Type Typical Cost Range Duration Thermal Imaging Add-On Report Turnaround
Phase 1: Pre-Pour Foundation $250–$450 1–2 hours Not typically applicable 24–48 hours
Phase 2: Pre-Drywall/Framing $350–$600 2–4 hours Included or +$100–$200 24–48 hours
Phase 3: Final Pre-Close $400–$700 3–5 hours Included or +$100–$200 24–48 hours
All 3 Phases (package) $900–$1,500 Varies Often included at discount Per phase
Pool Phase Inspection (if applicable) $200–$350 1–2 hours Optional 24–48 hours
Air Balancing Test (HVAC) $200–$400 1–2 hours N/A Same day

Many inspectors offer package pricing for all three phase inspections — ask about this. The per-inspection savings are modest, but the inspector's continuity across all three phases (knowing what the rough-in looked like when they evaluate the finished systems) adds analytical value.

Pool Inspections in New Construction: ARS §36-1681

If your new home includes a pool — either as a builder standard feature, an option you selected, or a feature you're adding post-close — pool inspection is a separate but equally important consideration in Arizona.

ARS §36-1681 — Arizona Pool Barrier Law

Arizona law requires that every residential swimming pool have a compliant barrier system that prevents unsupervised access by children. Compliance is verified by the local building department before a Certificate of Occupancy is issued. However, independent pool inspection verifies compliance at a more detailed level than the municipal inspector's walkthrough. Key elements:

Pool Equipment Startup Inspection

For a new construction pool, the equipment startup inspection verifies: pump operation (all speeds if variable speed), filter type and installation, chlorination system (salt, chemical, UV), heater startup, lighting (LED pool lights, exterior lighting), water chemistry baseline, pebble finish or plaster inspection, tile bond check, and deck inspection for cracks or drainage issues. Cost: $200–$350 for a standalone pool inspection; can be combined with the Phase 3 final inspection for efficiency.

Monsoon Season Construction Quality: What AZ Buyers Need to Know

Arizona's monsoon season runs officially from June 15 through September 30. During this period, the Phoenix metro can receive intense but brief rainstorms — sometimes 1–2 inches per hour during peak monsoon events. If your home is under construction during monsoon season, there are specific construction quality items to monitor:

Lumber Exposure and Moisture

Framing lumber for Arizona homes is typically kiln-dried Douglas Fir or Southern Yellow Pine, acclimated for desert humidity. Moderate rain exposure during the framing phase — a few monsoon events over 2–3 weeks — is manageable and does not typically cause long-term structural issues if the lumber is given time to dry before drywall installation. However, if your home's framing was severely water-saturated (multiple major rain events, lumber pooling water for extended periods) and the builder rushed to drywall before adequate drying, there is a risk of moisture being trapped in the wall cavity. An experienced pre-drywall inspector uses a moisture meter to verify lumber moisture content is within acceptable levels before drywall proceeds.

Flash Flood Risk During Site Work

Phoenix area lots that are actively graded and lacking established drainage infrastructure can experience significant water movement during monsoon flash flooding. Verify that your lot's drainage plan is implemented during construction — not just at final grading. Water infiltrating an incompletely formed foundation can cause soil displacement and compaction issues that affect slab quality.

Roof Dry-In During Monsoon

Between roof decking and final tile or shingle installation, roofing underlayment ("dry-in") protects the structure from rain. In monsoon season, the window between roof decking and dry-in installation is critical — roofing superintendents should not deck a roof on a day when monsoon storms are forecast without immediate dry-in capability. Most quality builders manage this — but it's worth monitoring if you can see your home's progress during this phase.

What City/County Inspectors Check vs. Your Inspector

Many first-time new construction buyers assume that because the municipality sends inspectors out during construction, their home has been independently verified at every stage. This assumption deserves scrutiny.

What Municipal Inspectors Are Checking

Municipal building inspectors verify code compliance — specifically, that the construction meets the minimum standards established by the adopted building code (typically IBC/IRC 2021 in most Phoenix metro jurisdictions, with local amendments). They are checking for life-safety issues: structural integrity, electrical safety, plumbing drainage, fire separation. They are NOT checking quality, workmanship quality above the minimum code level, or design adherence. A home can pass every municipal inspection and still have defects that cost you tens of thousands of dollars to remediate — because code compliance is the floor, not the ceiling.

What Your Inspector Is Checking

Your independent inspector checks everything the municipal inspector checks (and can flag code violations the municipal inspector may have missed or interpreted differently), PLUS quality items above code minimum. Was the return air duct slightly undersized? Code doesn't specify sizing requirements in that level of detail — it just says "appropriate." Your inspector knows from ACCA Manual J principles what "appropriate" means for your home. Did the tile installer cut corners on adhesive coverage? No code addresses that — but your inspector knows how to tap-test hollow tile. The municipal inspector and your inspector are complementary, not interchangeable.

Radon in Arizona New Construction: Is It a Concern?

Radon is a naturally occurring radioactive gas produced by uranium decay in soil. It's the second leading cause of lung cancer in the US (after smoking). In Arizona, radon levels vary by geography — northern Arizona and areas with granite-heavy geology tend to have higher radon potential; the Valley of the Sun metro has lower average levels but is not zero-risk. The EPA recommends testing any home — new or resale — for radon. For new construction, the best time to test is after the home is complete and sealed (final inspection phase), with radon measurement devices placed in the lowest occupied area for 48–90 hours. Radon mitigation systems (sub-slab depressurization) can be installed in new construction before the slab is poured at modest cost ($300–$600) and are more expensive to retrofit ($800–$2,500) after the fact. If your new construction community is in an area of known radon potential, ask the builder if radon-resistant construction features are standard or available.

Frequently Missed Items in Arizona Builder Blue Tape Walkthroughs

The builder's Blue Tape walkthrough covers cosmetic items. But because buyers are seeing their nearly-complete home for the first time — often emotionally exciting — items that should be flagged sometimes get overlooked. Here's a list of items commonly missed during builder walkthroughs that your independent inspector specifically checks:

After You Close: Ongoing Warranty Management

Your relationship with your builder doesn't end at closing — it continues through the warranty period. Here's how to manage it effectively:

Year 1 Warranty Submission (Workmanship)

Most builders allow you to submit a warranty punch list at approximately 11 months post-close — just before the one-year workmanship warranty expires. Conduct a thorough walk of your home at the 10–11 month mark and document everything: paint touch-ups, grout cracking (normal in new construction as the home settles — builder should re-grout), caulk separation at tubs/showers, door adjustment, drywall nail pops. Submit this list in writing (email) to the builder's warranty department by the one-year mark.

Year 8 Mechanical Warranty Monitoring

HVAC, plumbing, and electrical systems carry 8-year warranty coverage under ARS §12-1361. Keep records of any system malfunctions, service calls, and repairs. If a mechanical system fails within 8 years due to defective installation rather than normal wear, you have a warranty claim. The key distinction: a filter that was never changed is normal wear; a condensate line that was installed with improper slope and has been causing annual leaks since Year 1 is a construction defect.

Year 10 Structural Monitoring

Foundation cracking in Phoenix new construction — specifically PT slabs — should be monitored. Some minor shrinkage cracking is normal. Significant cracking (1/4" wide or larger, displacement, diagonal cracking near corners) warrants immediate professional evaluation. Document with dated photographs. If you had a pre-pour inspection, your inspector's report is the baseline record for comparison.